Block 1 — material-flow balancing
A flow-allocation model and a digital working environment for the result were created.
An integrated decision-support system for a network of distribution centers. The project develops in stages: flow first, then workforce, then shift assignment and operational control.
Material flow, workforce availability and actual shift execution are traditionally planned separately. The goal is to turn them into consecutive inputs of one system while keeping the manager in control.
Allocation and balancing of inbound and outbound flow across distribution centers, with control of planning-data freshness.
Required capacity, availability schedules, roles, internal and external labor.
Operation sequences, constraints, docks, employee availability and optimized schedules.
The system gradually moves key logic from manual Excel planning into a reproducible digital environment.
Planned material flow, work schedules, operating standards and technological constraints.
Balancing, resource calculation, constraint-based scheduling and constraint validation.
Versioning of data and results, history of plans and calculated assignments.
Input updates, calculation launch and views by vehicle, employee and dock.
A flow-allocation model and a digital working environment for the result were created.
Flow was linked to required labor capacity, roles and actual availability intervals.
The working draft calculates operation sequences with roles, availability, docks and technological constraints.
Debatable operating rules are validated in practice first. The mathematical model captures agreed logic; it does not replace it.